Lyndon Steel Co. of Winston-Salem, NC was selected to fabricate the steel for the Wake Forest University scoreboard. Lyndon chose Sumter’s 100D8814 Inhibitive Primer Gray to protect the steel before and during the erection process. 100D8814 meets or exceeds the performance requirements of SSPC Paint No. 25 and MPI # 76.